Latest News
⚡ Highlights from the 3rd PSC Expo & Seminar! ⚡ Celebrating the Appointment of Executive Engineer Majadur Rahman Tara! ⚡ স্বনামধন্য কনসালট্যান্টের সঙ্গে সৌজন্য সাক্ষাৎ ⚡ First Work Order of 2025: BBT Project for Ziska Pharmaceutical ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL. ⚡ Highlights from the 3rd PSC Expo & Seminar! ⚡ Celebrating the Appointment of Executive Engineer Majadur Rahman Tara! ⚡ স্বনামধন্য কনসালট্যান্টের সঙ্গে সৌজন্য সাক্ষাৎ ⚡ First Work Order of 2025: BBT Project for Ziska Pharmaceutical ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL.

POWERtrac is also undertaking industrial Wiring & Cabling, Industrial Erection, Ducting-Plumbing, Lighting solutions for industries, Five-Star Hotels and similar projects big installations in similar project Directors (PD) and Project owners can contact for on-time completion of such projects with the support of our skilled engineers and team members.

POWERtrac has completed more than 30 nos. of 132 kV, 33kV GIS/AIS Project’s Installation, Testing, Pre-commissioning and Commissioning with its all logistics like high capacity Crane, Skilled Team and precision instruments like CPC-100, Micro Ohm Meter, Insulation tester, Primary injector, Secondary injector, Over head wire rope puller etc.