Latest News
⚡ POWERtrac Group Successfully Commissions 5MVA, 33kV Substation for Polypack Woven Industries ⚡ POWERtrac Group and Kalpa Electrical Pvt. Ltd. Enter Strategic Distribution and Technology Partnership ⚡ Highlights from the 3rd PSC Expo & Seminar! ⚡ Celebrating the Appointment of Executive Engineer Majadur Rahman Tara! ⚡ স্বনামধন্য কনসালট্যান্টের সঙ্গে সৌজন্য সাক্ষাৎ ⚡ First Work Order of 2025: BBT Project for Ziska Pharmaceutical ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL. ⚡ POWERtrac Group Successfully Commissions 5MVA, 33kV Substation for Polypack Woven Industries ⚡ POWERtrac Group and Kalpa Electrical Pvt. Ltd. Enter Strategic Distribution and Technology Partnership ⚡ Highlights from the 3rd PSC Expo & Seminar! ⚡ Celebrating the Appointment of Executive Engineer Majadur Rahman Tara! ⚡ স্বনামধন্য কনসালট্যান্টের সঙ্গে সৌজন্য সাক্ষাৎ ⚡ First Work Order of 2025: BBT Project for Ziska Pharmaceutical ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL.

400 kVA Residential Substation & Power Distribution Project

Project Scope & Works Executed

  • Design and installation of 400 kVA Substation System
  • Supply and installation of 400 kVA, 11/0.415 kV Transformer
  • Installation of 11 kV HT Switchgear for primary power control
  • Installation of 11 kV Lightning Arresters for surge protection
  • Installation of 11 kV Dropout Fuse for transformer protection
  • Supply and installation of LT Switchgear Panel for low-voltage distribution
  • Installation of Automatic PFI Plant – 240 kVAr for power factor correction
  • Installation of ELT Panel Unit for electrical load termination and protection
  • Supply and installation of MDB (Main Distribution Board) Panel
  • Installation of 11 kV Heat Shrink Cable Jointing Kits
  • Installation of ELB (Earth Leakage Breaker) for personnel safety
  • Complete installation, testing, commissioning, and handover

Project Summary

POWERtrac successfully executed a complete 400 kVA residential substation and power distribution system for Concord Nishorgo, delivering a safe, reliable, and energy-efficient electrical infrastructure for modern residential living. The project integrated HT protection equipment, robust LT and MDB panels, and an automatic PFI plant to ensure voltage stability, reduced energy losses, and improved power quality. With comprehensive earthing, surge protection, and ELB safety measures, the installation ensures long-term operational reliability and compliance with residential electrical standards while supporting uninterrupted power supply for residents.