⚡ POWERtrac Group Successfully Commissions 5MVA, 33kV Substation for Polypack Woven Industries ⚡ POWERtrac Group and Kalpa Electrical Pvt. Ltd. Enter Strategic Distribution and Technology Partnership ⚡ Highlights from the 3rd PSC Expo & Seminar! ⚡ Celebrating the Appointment of Executive Engineer Majadur Rahman Tara! ⚡ স্বনামধন্য কনসালট্যান্টের সঙ্গে সৌজন্য সাক্ষাৎ ⚡ First Work Order of 2025: BBT Project for Ziska Pharmaceutical ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL. ⚡ POWERtrac Group Successfully Commissions 5MVA, 33kV Substation for Polypack Woven Industries ⚡ POWERtrac Group and Kalpa Electrical Pvt. Ltd. Enter Strategic Distribution and Technology Partnership ⚡ Highlights from the 3rd PSC Expo & Seminar! ⚡ Celebrating the Appointment of Executive Engineer Majadur Rahman Tara! ⚡ স্বনামধন্য কনসালট্যান্টের সঙ্গে সৌজন্য সাক্ষাৎ ⚡ First Work Order of 2025: BBT Project for Ziska Pharmaceutical ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL.

Garments Industry Electrical Power System Project

Project Scope & Works Executed

  • Supply and installation of HT Switchgear (VCB) for primary power control and protection
  • Supply and installation of HT Switchgear (ACB) for reliable switching and isolation
  • Installation of LT Switchgear – 2000A for main low-voltage power distribution
  • Installation of 2000A LT Switchgear (Generator Control Panel) for seamless DG power integration
  • Installation of Automatic PFI Plant – 2400 kVAr to improve power factor and reduce energy losses
  • Installation of ELB (Earth Leakage Breaker) for enhanced personnel and equipment safety
  • Complete installation, testing, commissioning, and operational handover

Project Summary

POWERtrac successfully executed a comprehensive electrical power distribution project for Unicorn Sweater Limited, ensuring reliable and efficient power supply for continuous garment manufacturing operations. The project integrated advanced HT switchgear (VCB & ACB), high-capacity LT distribution and generator control panels, and a large 2400 kVAr automatic PFI plant to optimize power quality and energy efficiency. With added safety through ELB protection and robust system integration, the installation delivers stable operation, reduced electrical losses, and dependable backup power readiness—supporting uninterrupted production and long-term operational reliability.