Bay Footwear Limited (Unit-2)
Manufacturing Power Substation Solution
Project Scope & Works Executed
- Supply of 7.5 MVA Power Transformer with OLTC
- Installation of Outdoor 33kV HT Switchgear
- Supply of Cast Resin Distribution Transformers
- Installation of High-capacity LT Switchgear
- Installation of Automatic PFI Plant
- Full system testing and commissioning
Project Summary
POWERtrac delivered a robust industrial power substation for Bay Footwear Limited, Unit-2, designed to support heavy manufacturing operations. The system ensures electrical safety, reduced power loss, and consistent energy supply, enabling uninterrupted footwear production in Gazipur’s industrial zone.