⚡ POWERtrac at SAFECON 2026 — A 3-Day Showcase of Innovation in Power & Electrical Engineering Solutions Bangladesh ⚡ Q-Center & Q-Hotel (Quality Feeds Ltd.) — 2×2000 kVA Substation & BBT System Successfully Commissioned by POWERtrac | Dhaka ⚡ Bandhon City Development — 500 kVA Substation Successfully Commissioned by POWERtrac | Urban Power Infrastructure Bangladesh ⚡ Bashundhara Golf Driving Range Stadium Gets 1600 KVA Substation & 2500A BBT Power System | POWERtrac Project Update ⚡ Polypack Woven Industries — 5MVA, 33kV Industrial Substation Successfully Commissioned by POWERtrac ⚡ POWERtrac Group & Kalpa Electrical Pvt. Ltd. — Strategic Distribution & Technology Partnership MoU Signed ⚡ 3rd International PSC Expo & Seminar — POWERtrac Showcases Smart & Sustainable Electrical Solutions ⚡ Ziska Pharmaceutical — POWERtrac Secures First Work Order of 2025 with BBT Project ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL. ⚡ POWERtrac at SAFECON 2026 — A 3-Day Showcase of Innovation in Power & Electrical Engineering Solutions Bangladesh ⚡ Q-Center & Q-Hotel (Quality Feeds Ltd.) — 2×2000 kVA Substation & BBT System Successfully Commissioned by POWERtrac | Dhaka ⚡ Bandhon City Development — 500 kVA Substation Successfully Commissioned by POWERtrac | Urban Power Infrastructure Bangladesh ⚡ Bashundhara Golf Driving Range Stadium Gets 1600 KVA Substation & 2500A BBT Power System | POWERtrac Project Update ⚡ Polypack Woven Industries — 5MVA, 33kV Industrial Substation Successfully Commissioned by POWERtrac ⚡ POWERtrac Group & Kalpa Electrical Pvt. Ltd. — Strategic Distribution & Technology Partnership MoU Signed ⚡ 3rd International PSC Expo & Seminar — POWERtrac Showcases Smart & Sustainable Electrical Solutions ⚡ Ziska Pharmaceutical — POWERtrac Secures First Work Order of 2025 with BBT Project ⚡ Successful technical seminar with engineers from 12 districts across Bangladesh, under the Khulna Division of the Public Works Department (PWD). ⚡ PROMOTED: Engr. Joy Aditya, the factory head of POWERtrac Group has recently been promoted as DGM. ⚡ We have successfully handed over 1. Compact Sub-Station(X2) 2. 1250 KVA, 33/0.415 KV Sub-Station(X2)... ⚡ We have successfully handed Over Tr-1,Tr-2 Dry Type Transformer Varendra University, Rajshahi ⚡ POWERtrac has successfully completed the Design, Supply, Installation, and Commissioning of 100 KWp .... ⚡ We have successfully handed over 5.5 MVA 33kv and 3.5 MVA, 11kv Substation at ICCL.

Bashundhara Bazar Protidin — 3.15 MVA & 4 MVA Dual Commercial Substation | POWERtrac

Powering One of Bangladesh's Largest Retail Complexes with Advanced Electrical Infrastructure

When Bashundhara Bazar Protidin demanded a power system as ambitious as its scale, POWERtrac delivered. This landmark project stands as a testament to what cutting-edge commercial electrical engineering looks like in Bangladesh — a fully integrated, dual-transformer substation system engineered for uninterrupted performance, maximum safety, and long-term reliability.

The Challenge

Large commercial complexes like Bashundhara Bazar Protidin require not just raw power, but intelligent power — systems that handle extreme electrical loads, protect sensitive equipment, maintain power quality, and eliminate single points of failure. Meeting this challenge demanded a solution with zero compromises.

What POWERtrac Delivered

POWERtrac designed, supplied, installed, tested, commissioned, and synchronized a complete high-voltage electrical infrastructure — from 33 kV grid entry to low-tension distribution — covering every layer of the power chain:

Dual Transformer System: Two indoor dry-type power transformers rated at 3.15 MVA and 4 MVA were deployed for clean, efficient, and low-maintenance power conversion ideal for commercial indoor environments.

High-Voltage Protection & Control (33 kV): A full suite of 33 kV equipment including Vacuum Circuit Breaker (VCB) switchgear at 630A, Auto Circuit Recloser (ACR), Air Break Switch (ABS), and dedicated CT & PT units ensures precise metering, automatic fault isolation, and enhanced grid protection.

High-Capacity LT Distribution: Three LT switchgear panels — rated at 6300A, 5000A, and 800A — along with a 5000A Bus Coupler provide flexible, redundant, and scalable low-tension power distribution across the complex.

Automatic Power Factor Correction: Dual automatic PFI plants rated at 2400 kVAR and 1890 kVAR actively optimize power factor in real time, reducing energy waste, improving efficiency, and lowering utility costs.

Personnel & Equipment Safety: Earth Leakage Breakers (ELB) safeguard both human lives and critical electrical assets throughout the installation.

The Result

A future-ready, fully redundant commercial power infrastructure — delivering stable, high-quality electricity across every floor and zone of Bashundhara Bazar Protidin. The system is built to handle peak commercial loads while maintaining operational continuity, power quality, and safety — even under fault conditions.